Which 7 details should I send before an inquiry?
This list is not paperwork. It is the input needed to get the capacity, the module count and the structure right. Photos of the site are enough to start: give what you know, and the rest is filled in on the phone.
-
1. Vessel or silo dead weight
Why it is needed: dead load is one term in the sizing. Left out or undercounted, the capacity of every module is chosen too small, the modules run at full load and service life drops. Agitator, jacket, insulation and fittings all count; leaving them out is the same as sizing for less dead load than the modules carry.
-
2. Material name and maximum fill
Why it is needed: the material decides the wetted material, the sealing and whether an explosion-proof version is required (corrosive, hygienic, dusty and flammable duties differ). The maximum fill decides the other term in the sizing and the capacity step. Size on the full fill, so a vessel filled to the top does not overload.
-
3. Number of modules planned, or the number of existing feet
Why it is needed: the sizing divides the total weight by the number of modules. Take one module per support point (3 feet, 3 modules; 4 feet, 4 modules); fewer turns the load into a cantilever. On a vessel already in place, counting the legs is enough.
-
4. Mounting space: leg size, height available for a module, leg spacing, and whether the floor may be altered
Why it is needed: this decides whether a module fits at all, which structure is used and whether the part has to be custom-built. Tight space calls for a compact structure; flange and hole spacing can be machined to drawing. Where the floor may not be touched, the approach differs.
-
5. Explosion-proof, corrosion-resistant or hygienic requirements
Why it is needed: these decide the load cell, indicator and junction box combination. Explosion-proof versions are available (Ex ia IIC T6); whether one suits the area is checked against the area and the material, so describe both, and the selection and the accessories are checked together.
-
6. Where the weight signal goes: a local indicator, or a PLC / DCS / host system
Why it is needed: this decides the indicator and the signal output. For a system connection the interface form and protocol also need confirming (the output follows the configuration). Saying it up front saves rework at the site later.
-
7. The date you need it
Why it is needed: production and shipping are planned around your date. Standard items: some ex stock, others about 1 week; custom and non-standard items are confirmed against the order specification and quantity.
Calling with an incomplete list is fine. What you give is used for this inquiry and the technical conversation after it; the page has no form and stores nothing.
Send what you know from these seven, and the rest is filled in on the phone:
Why is there no inquiry form on this page?
The site has no back end, so nothing typed into a form would be stored. For a configuration recommendation a phone call is faster: a working condition usually needs two or three questions back and forth, and one call settles it. Photos and nameplates can also be sent on WhatsApp to the same number.
Useful entry points: Selection & Resources (formula, worked examples, acceptance method) · FAQ (what to check first when a reading looks wrong) · Products (models grouped by capacity)
What happens from design to commissioning support?
- Design: the structure is fixed against the vessel, the material and the space available. Drawings or site dimensions help; without them, start from the working condition on the phone.
- Selection: check the capacity per module against the industry criterion dead load + live load ≤ rated capacity × number of modules × 70%, then fix the module count and the structure. The criterion and worked examples are on the Selection & Resources page.
- Production: built to the confirmed configuration; custom parts are machined to drawing, with flange and mounting hole spacing confirmed on the drawing.
- Dispatch: standard items are partly ex stock and partly about 1 week; custom and non-standard items are confirmed against the order specification and quantity.
- Installation guidance: before fitting, the points that decide whether the system reads are covered — the nut on top of the support bolt loosened, the sleeve left free, enough restraint clearance, and feed pipes run through flexible hose or extra length.
- Commissioning support: calibration and acceptance — test weights at 20%, 50% and full scale, three points, run on three consecutive days — is written up on Selection & Resources. If a reading looks wrong during commissioning, run the checks on the FAQ page first, then call.
Criterion, worked examples and acceptance method: Selection & Resources. Checks to run before calling: FAQ. The flow here is the same as on the home page.
Still unsure what to send?
Tell us: vessel dead weight, product weight, number of support feet, product characteristics, site conditions, and whether it is a new build or a retrofit.