Page updated:

Weighing Module FAQ: check the installation in this order

This page is written for fault-finding on site: answer first, then the action, then a criterion or a next step. Work through it on your phone.

Start here: nothing reads on the indicator? Check that the nuts on top of the support screws have been released and the sleeve is free. (From public technical material.)

Reading wrong, or want to ask about the duty directly? Send the symptom, the readings and your vessel details.

WhatsApp

Send the fault, the readings and the vessel details, and we will come back with an answer.

If WhatsApp does not open, call +86 183 51238137.

Call +86 183 51238137

Something is wrong after installation: work through this order

Fault-finding order (do not skip steps)

  1. The reading is wrong, or nothing reads at all → see F3: support screw nuts, capacity setting, rigid pipework.
  2. No response to load → see F3, item 6, and F4: a seized limit stop, a deformed support, no room under the legs.
  3. The numbers keep jumping → see F3, items 4 and 5: a damp junction box, electromagnetic interference, an unstable supply.
  4. Is it damaged, or does it just need calibration? → see F10: read whether the curve steps or climbs.

The ten blocks below each open with a direct answer and close with a criterion or a next step. Each block has its own anchor, so a link can be sent straight to the person on site.

F1 How do I size a weighing module?

Use the industry rule dead load + live load ≤ rated capacity × number of modules × 70% to check the capacity per module, then move up to the next capacity step (source: public technical literature).

Worked example: dead load (vessel) 2 t + live load (product) 3 t = 5 t → 3 modules, at 70% → rated capacity per module ≥ 5 ÷ (3 × 0.7) ≈ 2.38 t → take the 3 t module.

Actions

  1. Get two figures: the vessel weight and the maximum product weight (ask the process or maintenance department).
  2. Count the support legs: the number of support points sets the number of modules.
  3. Work out the capacity per module, then take the next step up (within 0.22–2.2 t / 4.4 t / 9 t / 13.6 t / 20 t or 0.5–3 t / 5 t / 10 t / 15–20 t).

Criterion: the module count follows the actual number of support points; after calculating, take the next capacity step up, never down.

Next step: the full version (how to select, install and verify for four duties) is on Selection & Resources.

F2 Do I need three modules or four?

Three modules suit three-point support, four suit four-point support. On a vessel that already has support legs, the leg count decides.

Actions

  1. Count the existing support legs (3 legs → 3 modules, 4 legs → 4 modules).
  2. A set normally contains 1 fixed module + 1 semi-floating module, with floating modules for the rest (to absorb thermal movement and installation tolerance).
  3. On a new vertical cylindrical vessel, three-point support is more stable; where wind load, sway or vibration is present, or the vessel lies horizontally, four-point support is advisable.

Criterion: module count = number of support points. Do not drop a support point to save one module — that turns the vessel into a cantilever.

Next step: models and capacity steps are on the home page; the structure and module count rules come from public technical material.

F3 The reading is wrong, or nothing reads at all. What do I check first?

Check that the nuts on top of the support screws have been released and the sleeve is free.

Fault-finding order

  1. The nuts on top of the support screws were not released / the sleeve is not free ⇒ release the nuts so the sleeve is free again.
  2. The capacity is set wrongly: note the distinction — this is the rated capacity of the module, not the span set in the indicator; the vessel's own weight (dead load) must be included (check it with the industry rule dead load + live load ≤ rated capacity × number of modules × 70%, source: public technical literature).
  3. The feed pipework is rigid ⇒ change it to a flexible connection, or lengthen the pipe run (a rigid pipe carries part of the real load away from the load cells).
  4. A damp junction box, unused entries left open ⇒ plug the unused entries with sealing plugs and fit a protective box outdoors.
  5. An unstable supply at the indicator ⇒ a voltage outside the permitted range makes the reading drift; use a stabilised supply.
  6. The limit stop has seized (clearance too small, bottomed out by thermal expansion) ⇒ reset the limit-stop clearance so slight movement is possible.

Criteria

Next step: the full table of eight faults is on Selection & Resources. If the reading is still wrong, send us the symptom and a photo of the indicator.

WhatsApp

If WhatsApp does not open, call +86 183 51238137.

F4 The vessel is already installed. Can weighing still be added?

Yes. Fit weighing modules to a tank, hopper or reactor and it becomes a weighing system; the vessel does not have to be rebuilt as a scale platform and no extra floor space is needed.

Three checks on site

  1. Measure: vessel weight + maximum product weight → work out the capacity per module with the formula.
  2. Check the supports: the module count follows the existing support legs; confirm there is room to fit them at the legs.
  3. Check three things: is there a place to weld a test-weight platform on the vessel; is the feed pipework rigid (if so, change it to a flexible connection or lengthen it); will the junction box be rained on or washed down.

Criteria

Next step: send these five items in one go — vessel weight, maximum product weight, number and layout of the support legs, the material and its characteristics, and the site environment (see Selection & Resources).

F5 Do I have to use test weights? What if the vessel has no test-weight platform?

Yes, use test weights. Test weights are the direct way to tell whether the system is accurate and whether it drifts; a vessel with no test platform is a common regret.

Actions

  1. Load test weights at 20 % / 50 % / 100 % and measure on three consecutive days, recording each day.
  2. New vessel: weld a test-weight platform at the design stage (normally below the vessel, so weights can be added and removed easily).
  3. Existing vessel: assess whether a platform can be added; if it is welded on, isolate the power and follow the earthing rules for welding, so that no current passes through the load cells.
  4. With no way to add weights, calibration has to rely on online comparison or a substitute load, and both accuracy and confidence are lower.

Criterion: a test-weight position on the vessel means you can check the system yourself later; without one, every dispute needs outside help, so it is worth adding first.

F6 How often should the system be calibrated?

Set the interval from the slope of the zero offset, not from a fixed calendar; log the zero more often after a new installation or an indicator change.

Actions

  1. After a new installation or an indicator change: log the zero more often (weekly, for example) and watch the trend.
  2. Once it is stable: set the calibration interval from the drift rate you observe (shorter if it drifts quickly, longer if it barely moves).
  3. After each calibration, record it the same way as the acceptance test (three points, consecutive measurements).

Criterion: a smooth climb with a very small slope ⇒ the interval can be extended; a step change ⇒ check for damage first, rather than calibrating more often.

Next step: the drift criteria are on Selection & Resources.

F7 Can you build to my drawing?

Yes, we take on custom-built work; flanges, mounting hole spacing, capacity and cable length are confirmed against your drawing and your duty.

What we need for a custom build

  1. The support structure and leg dimensions of the vessel or equipment (or drawings, photographs and the space available).
  2. Capacity and module count (the capacity per module from the F1 formula).
  3. The site environment: dust, moisture, corrosion, vibration, and whether the area is hazardous.
  4. The output required: indicator display, 4–20 mA, or communications to a PLC or DCS.
  5. Quantity and application (new installation or retrofit).

Criterion: whether it can be built is confirmed against your drawing and your duty.

Next step: for a hazardous area, Explosion-proof versions are available (Ex ia IIC T6); the exact configuration is confirmed against your working conditions. Send the five items above in one message and we can assess it.

F8 Can you produce under our own brand?

Yes. We also run a 1,000 m² stock warehouse and volume production.

Actions

  1. Agree how the branding works (nameplate, packaging, and whether the documentation carries your brand).
  2. Agree the model and specification (our existing models, or your own numbering).
  3. Agree the batch size and the repeat schedule (first batch, then replenishment).
  4. Agree the consistency requirement (the calibration must not change between batches, so the model and the acceptance method are fixed).

Criterion: stable long-term supply rests on a fixed specification and a fixed acceptance method.

Next step: send the branding scope, the model, the batch size and the schedule; the scale facts are on the home page.

F9 Do you hold stock, and how long is lead time?

Lead time depends on whether the item is a standard product: standard items, some ex stock, others about 1 week; custom and non-standard items are confirmed against the order specification.

Actions

  1. Say first whether the item is custom (custom and catalogue items run on different schedules).
  2. Give the model or capacity + module count + quantity.
  3. Give the date you need it by, and we will answer with a feasible date for that configuration.

Criterion: no lead time is a commitment until the model, the module count and the quantity are known. We hold a 1,000 m² stock warehouse (our own figures), but this page makes no "ships ex stock" claim.

Next step: send all seven items at once (vessel weight and maximum product weight / number and layout of the support legs / the material and its characteristics / the site environment / the output required / new installation or retrofit / quantity and required date) ⇒ Selection & Resources.

F10 What does the warranty cover, and is a drifting reading a fault or a calibration issue?

Warranty: 12 months.

An impact fault shows as a step change; long-term drift shows as a smooth climb. Read the curve first, then decide whether to replace or to compensate.

Actions

  1. Pull the daily zero record (even a handwritten one) and read the shape of the curve.
  2. A step change ⇒ usually damage from impact, overload or moisture ⇒ replace the module with the same specification.
  3. A smooth climb ⇒ long-term drift (stress relaxation in the spring element plus ageing of the strain gauge adhesive) ⇒ compensate online or recalibrate first; do not replace the whole set in a hurry.
  4. While you are there, clear two frequent causes: has "zero on power-up" been set to disabled, and does automatic zero tracking have a threshold and is it disabled during loading.

Criteria

Next step: to have a curve judged, send the daily zero record (a photograph or a table); the acceptance method is on Selection & Resources.

F11 Why can the same model name come with different capacities or wiring?

Because this factory does carry a few product lines that share a name but differ in configuration; when selecting, check the capacity, the wiring and the outline together.

The three cases that come up: ① same parameters, different wiring (4-wire / 6-wire); ② same name, different capacity ranges; ③ same parameters, different outline.

What to do

  1. Check the wiring first: 4-wire or 6-wire. Several pairs here are "identical parameters, wiring is the only difference" — for example HY-SBS / HY-SBS-M, HY-MTB / HY-MTB-M, HY-SB / HY-SB-M.
  2. Then the capacity: some names are shared across ranges that do not overlap at all — HY-SQB exists as 100-300 kg and as 0.5-5 t.
  3. Then the outline: even identical parameters may not fit. HY-SBT and HY-0805 match item for item electrically, but the overall lengths differ (137 versus 167) and the base-plate holes are not interchangeable.
  4. Write all three on the order: model + capacity + wiring, never the model alone.

Criteria

Next step: if you are unsure which version you have, send a photo of the nameplate; the full model list is under Products.

F12 Two sources disagree on a parameter. Which one wins?

The nameplate on the actual unit.

The nameplate travels with the goods and can be traced; web pages, quotations and drawings are documents, and may lag or come from a different batch.

What to do

  1. Priority: nameplate on the unit > wiring label on the unit > drawing shipped with it > web page or quotation.
  2. Read the model, capacity and serial number from the nameplate; take the wiring from the label on the unit (the shield colour is described differently across models).
  3. If the nameplate really disagrees with the documents, use the nameplate and send us the photo to check.
  4. Small differences between batches are normal, but capacity, wiring or sensitivity disagreeing means the parts must not be mixed.

Criteria

Next step: send the nameplate photo together with the document you have; what to include in an enquiry is on Contact.

F13 What is the difference between 4-wire and 6-wire, and can they be swapped?

A sense pair. The extra two wires on a 6-wire cell (yellow / blue) return the excitation voltage the cell actually sees back to the indicator.

Swappable: they connect, but compensation differs — a 4-wire cell on a 6-wire indicator has no working compensation; a 6-wire cell on a 4-wire indicator leaves the sense wires unused.

What to do

  1. Count the wires: 4-wire is red (+excitation), black (−excitation), green (+signal), white (−signal); 6-wire adds yellow (+sense) and blue (−sense).
  2. Short cable, indicator nearby ⇒ 4-wire is enough; the drop is small.
  3. Long cable (tens of metres) or wide temperature swings ⇒ use 6-wire and let the indicator compensate through the sense pair.
  4. Do not fit 6-wire "for safety": if the indicator has no sense input, the two extra wires do nothing.

Criteria

Next step: the cable run and indicator model are enough to decide; the pairs are listed under Products.

F14 How do I choose between IP65, IP67 and IP68?

By how water reaches the cell, not by the size of the number.

IP65 resists water jets; IP67 withstands temporary immersion; IP68 withstands continuous immersion. (Grade definitions from public technical literature.)

What to do

  1. Washdown or splashing only (common in food and packaging lines) ⇒ IP65 usually suffices.
  2. Temporary immersion (pits, rain pooling, washdown that floods over the cell) ⇒ IP67.
  3. Continuous immersion or below the water table ⇒ then IP68.
  4. Temperature is separate: IP rating does not solve cold. For -40 °C duty, choose a cold-rated model.

Criteria

Next step: say whether the site is washdown, immersion or buried, and whether corrosive media are present; ratings per model are under Products.

Other questions that come up

Other frequent questions and how they are answered today
QuestionAnswer today
Can it be used in a hazardous area?Explosion-proof versions are available (Ex ia IIC T6); the exact configuration is confirmed against your working conditions.
What does it cost?Pricing follows the duty and the quantity.

For anything else, tell us the area, the material and the quantity and we will answer it for your case:

WhatsApp

Still not solved?

The quickest route is a message with the duty: vessel weight, maximum product weight, number of support legs, the material and its characteristics, the site environment, and what the indicator is doing (when it started and how the number moves).

Interested? Message us on WhatsApp.

WhatsApp

Call +86 183 51238137