First published · Chinese version: 称重模块怎么选型:三个算例

You are here: Home > Sizing

Weighing Module Sizing: Three Worked Examples from 500 L to 30 t

Sizing answers four questions only: how much each module carries, how many modules, how a set is configured, and which material and wiring. The first two decide whether the system works; the last two decide how long it lasts. Work through them in order — three complete examples from a 500 L reactor to a 30 t tank follow.

If the four numbers are uncertain, send them to us:

+86 183 5123 8137

On a phone, tap the button to dial.

Short answer: take the dead load plus the live load, divide by the number of modules, and check it against rated capacity × number of modules × 70% (source: public technical literature); then take the next capacity step up. The module count follows the support points — 3 feet, 3 modules; 4 feet, 4 modules. One set is 1 fixed + 1 semi-floating + the rest floating.

Which six numbers do I need before sizing?

What the sizing needs (one item missing and it cannot be settled)
Information Why it is needed
Vessel weight This is the dead load and it has to be counted. It is the item most often left out.
Weight of the attachments Agitator motor, jacket, insulation, platform and ladders are all dead load.
Product weight at full fill This is the live load. Use the full fill, not the usual batch.
Number of support points It sets the module count, and the module count goes straight into the formula.
Product characteristics Corrosiveness and temperature decide stainless steel or nickel-plated; whether the area is hazardous decides the configuration.
Distance from the modules to the indicator A long run drops the excitation voltage, which decides 4-wire or 6-wire.

How much capacity does each module need?

Direct answer: with the rule used across the industry (source: public technical literature):

dead load + live load ≤ rated capacity × number of modules × 70%

The 70% is the safety margin normally applied in the industry. It already covers the parts that are not calculated exactly: eccentric load, shock and wind load.

Use the formula backwards

First work out what each module actually carries:

load per module = (vessel weight + attachments + product at full fill) ÷ number of modules

Then put that figure against rated capacity × 70% and take the next capacity step up.

How do the three worked examples come out?

Example 1: 500 L reactor on 3 support feet

Example 1, known values
ItemValue
Vessel weightAbout 300 kg (agitator and jacket included)
Product at full fillAbout 400 kg
Support feet3

Work out: (300 + 400) ÷ 3 = 233 kg per module.

Check:

Result: take the 500 kg step. Do not take the 300 kg step: 233 kg per module looks sufficient, but it does not pass the 70% check.

Example 2: 5 t vessel on 4 support feet

Example 2, known values
ItemValue
Vessel weight5 t (insulation and platform included)
Product at full fill8 t
Support feet4

Work out: (5 + 8) ÷ 4 = 3.25 t per module.

Check:

Result: take the 5 t step. Where there is agitator shock or wind load on site, go up to the 8 t step.

Example 3: 30 t tank, also on 4 feet

Example 3, known values
ItemValue
Vessel weight30 t
Product at full fill50 t
Support feet4

Work out: (30 + 50) ÷ 4 = 20 t per module.

Check:

Result: take the 30 t step.

Now change the module count: on the same vessel with only 3 feet, 80 ÷ 3 = 26.7 t per module, and the 30 t step gives 30 × 3 × 70% = 63 t < 80 t — not enough, so the step has to go up to the 50 t. One module fewer can mean one capacity step higher. That is why the module count is not something to cut for convenience.

How many modules should the vessel have?

Direct answer: take the number of support points, not the number of modules you would like to save.

Three rules for the module count
Situation How to take it Basis
The vessel already has support feet 3 feet, 3 modules; 4 feet, 4 modules — the actual number of support points Public technical literature
A new vessel, vertical cylinder Three-point support is more stable; where wind load, sway or vibration is present, four-point support is advisable Public technical literature
Agitation or side impact Four-point, with limit stops Public technical literature

More modules is not automatically better: a larger count allows a smaller capacity per module, but every module then has to share the load evenly, levelling the mounting faces gets harder, and acceptance gets harder to pass.

How is a set of modules configured?

Direct answer: the modules in one system are not all the same: 1 fixed + 1 semi-floating + the rest full-floating.

If every module in the set is bought as fixed, the vessel has no room to expand or to deflect under load, and the modules are loaded sideways — the numbers will be wrong at the least, and the load cell can be damaged at the worst. On the Selection & Resources page this is the "tilted load / side load" fault among the eight installation faults.

Which material and wiring should I choose?

Material and wiring selection
Site condition What to choose Reason
Wet, washed down, corrosive atmosphere Stainless steel, hermetically sealed (a model whose documentation states its protection) A welded seal is the basis of moisture protection, but the cable entry and the junction box have to match it
Indoors, dry environment Alloy steel, nickel-plated Lower cost; a plated finish still has to be checked against the duty where a strong corrosive medium is present
Long run from the modules to the indicator 6-wire (with +sense / −sense) The sense wires compensate the excitation drop over a long cable; a short run is fine on 4-wire
Hazardous area Explosion-proof version (the exact selection is confirmed against the duty) The configuration follows the area classification on site; the wording of the marking follows the company position

What are the four common miscalculations?

  1. Sizing by volume. "A 5 m³ tank is 5 t." Product density varies widely (water 1.0, feed 0.5–0.7, mineral powder 1.5 and above), so sizing by volume can be far out.
  2. Forgetting the vessel weight. Only the product is counted. An empty vessel alone weighs from a few tonnes to tens of tonnes; leave it out and the module is certain to be undersized.
  3. Not applying the 70%. Total weight divided by the module count is bought as the rated capacity. There is no margin, so eccentric load or shock overloads it.
  4. Cutting the module count. 3 modules on 4 feet, or 4 modules reduced to 2. The load is uneven and acceptance will not pass.

Does this sheet settle the sizing?

Sizing information sheet (copy it for purchasing or for a supplier)
ItemYour value
Vessel weight (attachments included)____ t
Product weight at full fill____ t
Number of support points____ modules
Load per module worked out____ t (the first two added together ÷ module count)
Capacity step taken (next one up)____ t
Environment (indoor or outdoor, washed down, corrosive)____
Distance from the modules to the indicator____ m
Is a hazardous area involved?Yes / No
Is there a test-weight platform?Yes / No (without one, the vessel cannot be checked with weights later)

Where does the information on this page come from?

This page is general technical information, not a commitment for a specific project; the final selection is confirmed against the duty and the documentation supplied with the goods.

Sizing is done — what should I look at next?

Tap to dial: +86 183 5123 8137